Irrigation

Feasibility Study for Extension of Water Supply Scheme

from Indus River to Village Rehman Abad Shakar Dara along with Adjacent Villages, Kohat

Project Overview

A feasibility study for extending a water supply scheme from the Indus River to Shakar Dara and Rehman Abad, integrating solar-powered pumping stations.

Key Deliverables

Design of a multi-stage water supply system

Solar energy-based pumping solutions

Hydraulic modeling and infrastructure planning

Key Benefits

Sustainable water supply for 100,000 residents

Renewable energy-based water distribution

Long-term infrastructure sustainability

ABOUT US

Similar Urban Development
and
Infrastructure Projects

Irrigation

Spatial / Structure Planning of Municipal Infrastructure in Landi Kotal in Khyber Agency and Ghalanai in Mohmand Agency FATA

Irrigation

Planning, Feasibility Studies, Detailed Engineering Design and Capacity Building under Khyber Pakhtunkhwa Cities Improvement Project – Second Project Readiness Financing (KPCIP-PRF2) [ADB Funded].

Irrigation

Construction Supervision for “Khyber Pakhtunkhwa Cities Improvement Project (ADB 4061 – PAK and AIIB: 0214A) Contract No. KPCIP-Cons-01”