Spatial / Structure Planning of Municipal Infrastructure in Landi Kotal in Khyber Agency and Ghalanai in Mohmand Agency FATA

Irrigation Spatial / Structure Planning of Municipal Infrastructure In Landi Kotal in Khyber Agency and Ghalanai in Mohmand Agency FATA Project Overview The project focused on spatial and structural planning of municipal infrastructure in Landi Kotal and Ghalanai. It aimed to develop infrastructure for water supply, sewerage, roads, and solid waste management. Project Cost: $13 […]

Review of Master Planning, Design and Construction Supervision of Municipal Infrastructure of Khar, Bajaur Agency (Roads, Sanitation, drainage and Solid Waste Management)

Irrigation Review of Master Planning, Design and Construction Supervision Of Municipal Infrastructure of Khar, Bajaur Agency (Roads, Sanitation, drainage and Solid Waste Management) Project Overview This project aimed at developing municipal infrastructure in Khar, Bajaur, under the FATA Urban Centers Program. It included water supply, drainage, road rehabilitation, and solid waste management. Project Cost: $11 […]

Integrated Master Planning of Galiyat Region

Irrigation Integrated Master Planning of Galiyat Region Project Overview This project involved the integrated master planning of the Galiyat region, focusing on infrastructure, environmental sustainability, and municipal service improvements. Project Cost: $11.2 Million Funding Source: Government of Khyber Pakhtunkhwa Client Details: Galiyat Development Authority Key Deliverables GIS mapping and urban development strategy Environmental and hydrological […]

Consultancy for Feasibility Study for Timergara Gravity Water Supply Scheme, Dir (Lower)

Irrigation Consultancy for Feasibility Study for Timergara Gravity Water Supply Scheme, Dir (Lower) Project Overview A feasibility study for the development of a gravity-based water supply system in Timergara to enhance drinking water facilities for the region. Project Cost: $20.2 Million Funding Source: Government of Khyber Pakhtunkhwa Client Details: Public Health Engineering Departmentillion Key Deliverables […]

Feasibility Study for Construction of Gravity Flow Water Supply Scheme Khall PK-93

Irrigation Feasibility Study for Construction of Gravity Flow Water Supply Scheme Khall PK-93 Project Overview A feasibility study for a gravity flow water supply scheme in Khall, focusing on sustainable drinking water solutions. Project Cost: $10.1 Million Funding Source: Government of Khyber Pakhtunkhwa Client Details: Public Health Engineering Departmentillion Key Deliverables Feasibility study and hydraulic […]

Feasibility Study for Extension of Water Supply Scheme from Indus River to Village Rehman Abad Shakar Dara along with Adjacent Villages, Kohat

Irrigation Feasibility Study for Extension of Water Supply Scheme from Indus River to Village Rehman Abad Shakar Dara along with Adjacent Villages, Kohat Project Overview A feasibility study for extending a water supply scheme from the Indus River to Shakar Dara and Rehman Abad, integrating solar-powered pumping stations. Project Cost: $15.49 Million Funding Source: Government […]

Consultancy for Survey, Feasibility Study, Structural / Hydraulic Design & Submission of PC-I For Construction / Rehabilitation of Water Supply and Sanitation Schemes in Southern Districts of Khyber Pakhtunkhwa ADP No 308/210390(2021-22)

Irrigation Consultancy for Survey, Feasibility Study, Structural Hydraulic Design Submission of PC-I For Construction / Rehabilitation of Water Supply and Sanitation Schemes in Southern Districts of Khyber Pakhtunkhwa ADP No 308/210390(2021-22) Project Overview The project focuses on conducting a comprehensive feasibility study, structural and hydraulic design, and preparation of PC-I for water supply and sanitation […]

Construction Supervision of “Improvement, Rehabilitation and Modernization of Industrial Estate, Peshawar”

Irrigation Construction Supervision of Improvement Rehabilitation and Modernization of Industrial Estate, Peshawar Project Overview This project aims to upgrade the infrastructure of the Industrial Estate in Peshawar, focusing on roads, sewerage, water supply, and urban infrastructure. The initiative includes the review and supervision of construction activities to ensure quality, efficiency, and compliance with approved designs. […]

Improvement, Rehabilitation and Modernization of Industrial Estate Gadoon (Amazai) Swabi

Irrigation Improvement, Rehabilitation and Modernization of Industrial Estate Gadoon (Amazai) Swabi Project Overview The project focuses on the rehabilitation and modernization of Gadoon Amazai Industrial Estate in Swabi. The scope includes designing and improving the road network, drainage, water supply systems, and street electrification to enhance industrial efficiency. Project Cost: $8.05 Million Funding Source: Khyber […]

Consultancy for Feasibility Study & Design of DWSS Base on Surface Flow & other Perennial Water Bodies in Merged Areas (AIP) ADP No. 380/200105.

Irrigation Consultancy for Feasibility Study & Design of DWSS Base on Surface Flow & other Perennial Water Bodies in Merged Areas (AIP) ADP No. 380/200105. Project Overview This feasibility study and design project focuses on providing safe drinking water supply in the merged areas of Khyber Pakhtunkhwa using surface flow and other perennial water sources. […]